The following warnings occurred:
Warning [2] count(): Parameter must be an array or an object that implements Countable - Line: 802 - File: showthread.php PHP 7.4.29 (Linux)
File Line Function
/showthread.php 802 errorHandler->error





Post Reply 
 
Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Pak-EPA rejects Garden Avenue dualisation project
02-01-2009, 05:58 AM
Post: #1
Pak-EPA rejects Garden Avenue dualisation project
* Project envisages 300-foot wide dual carriageway
* Agency says project will diminish green cover

By Atif Khan

ISLAMABAD: The Pakistan Environment Protection Agency (Pak-EPA) on Saturday rejected a Capital Development Authority (CDA) project that envisaged the dualisation of Garden Avenue.

The Pak-EPA rejected the project on environmental grounds. Under the IEE/EIA Regulations, 2000, the CDA submitted an initial environmental examination (IEE) report of the project to the Pak-EPA for the approval.

The CDA stated in the IEE that it was planning to dualise the Garden Avenue that starts from I-8 roundabout and joins the Murree Road while passing through stadium, Lok Virsa and the National History Museum.

The proposed dualisation project envisaged 300 feet wide road consisting of dual carriageway. The CDA stated in the IEE that during the execution of the project 900 trees would be cut down.

The Pak-EPA stated in its letter to the CDA that the dualisation of the Garden Avenue was not justified, as presently the traffic volume on the road was low.

The agency also said that due to the dualisation of the road, the green cover would further diminish, which had already decreased due to recent development in Islamabad. The Pak-EPA said that the project was located in the ecologically sensitive area, which was a part of the Margalla Hills National Park, where all commercial activities were banned.

The Pak-EPA refused to approve the project under the Pakistan Environmental Protection Act, 1997. However, the agency suggested that if the project was essential, the CDA might consider widening of the existing single road by only 10 feet - 5 feet on each side - subject to the condition that only the existing shoulders may be constructed along the alignment.

Pak-EPA Monitoring Director Ziaul Islam told Daily Times that the decision was taken after careful assessment of the IEE submitted by the CDA. He said that Pak-EPA Director General Asif Shuja Khan visited the sight and conducted a through monitoring of the area.

Islam said that it was concluded during the monitoring that the dualisation would increase traffic volume in the area. He also said that since the CDA had already constructed Zero Point Interchange and dualised a number of roads in the capital, there was no need of dualisation of the Garden Avenue.

He said that the road projects irreparably damaged the flora and fauna of the area. He said that increased traffic on the Pir Sohawa Road was causing environment degradation. He said that along damage to vegetation, the wild life of the area was under threat, and species of birds were migrating from the area.

He also mentioned that the recent chopping of trees and vegetation at Parade Ground adjacent to the proposed project had already damaged the flora and fauna of the area.

No environment impact assessment was ever conducted for the Parade Ground project, where reportedly hundreds of trees and vegetations were removed from acres of land.

http://www.dailytimes.com.pk/default.asp...009_pg7_12
Find all posts by this user
Quote this message in a reply
Post Reply 


Messages In This Thread
Pak-EPA rejects Garden Avenue dualisation project - LahoreEstate - 02-01-2009 05:58 AM

Possibly Related Threads...
Thread: Author Replies: Views: Last Post
  Interest from 21 Construction Firms for Margalla Avenue-M1 Link Project LRE-Azan 0 669 11-01-2023 06:02 PM
Last Post: LRE-Azan
  DHAI-R Announces Benefits for Residents of Recently Merged Garden Villas LRE-Azan 0 549 09-30-2023 04:55 PM
Last Post: LRE-Azan
  CDA approved construction of linking road from Margalla Avenue to M1 LRE-Azan 0 720 08-18-2023 06:37 PM
Last Post: LRE-Azan
  Good news: Margalla Avenue to be Completed ‘Very Soon’ – Chairman CDA LRE-Azan 0 1,200 01-21-2023 01:15 PM
Last Post: LRE-Azan
  NHA ready to begin dualisation of Rawalpindi-Kahuta Road LRE-Azan 0 997 01-18-2023 03:04 PM
Last Post: LRE-Azan
  Lahore: Mehifil e Milaad at Al Rehman Garden Phase-7 LRE-Azan 0 1,543 11-22-2021 08:16 PM
Last Post: LRE-Azan
  Grand Avenue Lahore Residential Plots For Sale 24 Sep 2016 Salman 0 6,564 09-24-2016 12:51 PM
Last Post: Salman
  LDA Avenue 1 Final Notice To AllotteesFor Payment of Outstanding Dues Salman 0 5,651 04-18-2015 05:02 PM
Last Post: Salman
  Allottees of LDA Avenue-I have to wait for possession Salman 0 6,886 03-31-2014 07:36 PM
Last Post: Salman
  LDA Announced To Hand Over Possession Of Plots In LDA Avenue 1 From 31th March Salman 0 14,431 03-26-2014 06:06 PM
Last Post: Salman
  Al-Hamra Avenue Housing Scheme Islamabad Salman 0 10,217 03-06-2014 12:17 PM
Last Post: Salman
  Restriction on construction along Margalla Avenue Salman 0 6,341 12-28-2013 12:21 PM
Last Post: Salman
  Margalla Avenue Bypass project delayed Salman 0 7,999 12-11-2013 06:10 PM
Last Post: Salman
  CDA also rejects new Rs8 bn link road to Benazir Bhutto airport Salman 0 6,856 09-16-2013 04:38 PM
Last Post: Salman
  CDA to expedite construction work on Margalla Avenue Salman 0 5,578 04-29-2013 01:46 PM
Last Post: Salman
  CDA to expedite construction work on Margalla Avenue Salman 0 5,582 04-24-2013 01:15 PM
Last Post: Salman
  Margalla Avenue project awaits CDA attention Salman 0 5,906 11-19-2012 12:16 PM
Last Post: Salman
  Timely completion of Margalla Avenue demanded Salman 0 5,550 10-11-2012 11:43 AM
Last Post: Salman
  Work on Faisal Avenue bridge begin Salman 0 5,771 10-08-2012 12:50 PM
Last Post: Salman
  CDA fails to get land for Magalla Avenue extension Salman 0 7,262 10-08-2012 12:21 PM
Last Post: Salman

Forum Jump:


User(s) browsing this thread: 1 Guest(s)