Post Reply 
 
Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Revised Islamabad Master Plan
05-26-2009, 05:01 AM
Post: #1
Revised Islamabad Master Plan
Delay in approval hampers development of new sectors

Tuesday, May 26, 2009
Noor Aftab

Islamabad

Delay in approval of revised Master Plan of Islamabad is causing problems in various areas, including development of new residential sectors, which are necessary to cope with ever-increasing shortage of housing units in the metropolis.

Sources told ‘The News’ that a proposal had been made in the revised Master Plan to increase the total number of residential sectors from 56 to 68 for ensuring thousands of additional housing units in the city. They said it had also been proposed to increase the number of series of sectors from 16 to 18 by extending the limits of Islamabad to the areas adjacent to the motorway.

Currently, the capital city has around 85,000 housing units in the developed residential areas, showing shortage of over 50,000 housing units. The development of new residential sectors could help meet the demand for housing units but delay in approval of the revised Master Plan might further worsen the situation.

A UK-based firm, Mott McDonald Pakistan (MMP), was assigned the task some years back to revise the original Master Plan of Islamabad, covering current and future development needs of the city and various other aspects including new housing sectors, extension in municipal limits, industrial activities, environmental protection, road repair, new parks and recreational areas and safety of existing water reservoirs.

The consultant company submitted the draft of the revised Master Plan to the Capital Development Authority (CDA) prepared in line with the directives given by a four-member ministerial committee constituted by the prime minister for this purpose. But since then no sign has so far been appeared to show that the Master Plan would be implemented soon.

According to a CDA official, the master plans of cities in modern world are revised after every 25 years but it is astonishing that the Master Plan of Islamabad is being revised on full-scale for the first time since the establishment of the city in 1960s.

The sources said the government officials were more interested to make minor changes in the Master Plan than its full-scale revision that made it difficult for the concerned authorities to meet the growing demands in various areas.

The first change in the Master Plan was made in 1964 when the location of Islamabad University — later renamed as Quaid-i-Azam University — was shifted from the National Park Area to its current location.

The Sector E-11 was to be acquired and developed for low-income private and government employees, but in 1964, the CDA was stopped from acquiring the area in consideration of the location of Golra Sharif shrine.

In 1969, the rural periphery of Islamabad along Kahuta Road was turned into an Industrial Triangle for medium scale industries. The location of the Pakistan Institute of Medical Sciences (PIMS) was also changed in 1974 from the area close to the National Institute of Health (NIH) near Chak Shahzad to its present location in Sector G-8/3.

Originally, half the H-series sectors were designated as green buffer and the other half for special institutions. But, in 1974, upper half of H-8 was given to different institutions for constructing their buildings, and H-10 and H-12 were selected for private educational institutes.

The CDA deputy director general (planning wing) told ‘The News’ that the draft of the revised Master Plan had been completed sometime back and they were preparing to give a presentation to the secretary Cabinet. He said the presentation would hopefully be conducted in the first week of the next month.

He said after the presentation the draft would be presented before the Cabinet for its detailed analysis before its final approval. “As the Master Plan has not been revised for the last so many decades, its revised version has been prepared in such a way that will certainly help meet the growing requirements and demands in various areas.

http://www.thenews.com.pk/daily_detail.asp?id=179573
Find all posts by this user
Quote this message in a reply
Post Reply 


Possibly Related Threads...
Thread: Author Replies: Views: Last Post
  Rawalpindi Master Plan Advances: Approval Granted for Land Classification Map LRE-Azan 0 484 12-05-2023 07:03 PM
Last Post: LRE-Azan
  LDA Announces New SOPs for Building Control in Accordance With Lahore Master Plan LRE-Azan 0 673 09-13-2023 07:35 PM
Last Post: LRE-Azan
  Upcoming Green Spaces: CDA's Ambitious Plan for New Parks in Islamabad LRE-Azan 0 640 08-19-2023 02:09 PM
Last Post: LRE-Azan
  NAB Investigation into Pervaiz Elahi for Endorsing Master Plan 2050 LRE-Azan 0 870 04-18-2023 05:05 PM
Last Post: LRE-Azan
  LHC Gives LDA Permission to Operate Under the 2016 Master Plan LRE-Azan 0 790 04-13-2023 05:52 PM
Last Post: LRE-Azan
  Islamabad Govt to Revise the ICT Master Plan to Create New Sanitary Landfill Sites LRE-Azan 0 927 02-11-2023 05:48 PM
Last Post: LRE-Azan
  Lahore Master Plan declared undeveloped 33,000 acres of housing projects LRE-Azan 0 1,269 01-24-2023 03:24 PM
Last Post: LRE-Azan
  RDA preparing master plan for next 25 years LRE-Azan 0 904 01-18-2023 03:03 PM
Last Post: LRE-Azan
  Lahore Master Plan News : New city centre in Gulberg a part of master plan-2050 LRE-Azan 0 1,123 01-16-2023 07:26 PM
Last Post: LRE-Azan
  FBR Ordered to Revoke To Recently Revised Revised Property Valuation Rates LRE-Azan 0 1,358 12-07-2021 11:51 PM
Last Post: LRE-Azan
  Master plan for Gwadar smart port city to be finalized soon Salman 0 3,887 08-09-2017 03:02 PM
Last Post: Salman
  LDA Introduces Revised SOP For Transfer Of Plots Salman 0 5,374 03-11-2014 06:43 PM
Last Post: Salman
  New plan: In the next few years, Rawat may be the new Islamabad Salman 0 4,281 01-29-2014 05:28 PM
Last Post: Salman
  Owners of 5-marla houses served notices to pay revised property tax Salman 0 4,727 01-27-2014 05:17 PM
Last Post: Salman
  Bahria Town Karachi Plans To Launch Its Master Planned Gated Community Soon Salman 0 5,597 01-09-2014 03:06 PM
Last Post: Salman
  DHA Karachi Revised the DHA Phase 8 Master Plan Salman 0 7,972 11-22-2013 05:27 PM
Last Post: Salman
  DHA Karachi: SHC seeks original master plan of Phase-8 Salman 0 9,051 11-13-2013 05:08 PM
Last Post: Salman
  No plan to build 'new Islamabad' on the cards: CDA chief tells Senate body Salman 0 10,119 10-05-2013 12:10 PM
Last Post: Salman
  Punjab : Capital Gains Tax Rates Revised Salman 0 6,366 06-18-2013 02:10 PM
Last Post: Salman
  Punjab govt approves 21 revised development schemes Salman 0 6,078 05-13-2013 02:00 PM
Last Post: Salman

Forum Jump:


User(s) browsing this thread: 1 Guest(s)