Post Reply 
 
Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Guddu plant deal raises doubts about IPPs, RPPs
09-20-2009, 06:05 AM
Post: #1
Guddu plant deal raises doubts about IPPs, RPPs
[Image: dam-608.JPG?MOD=AJPERES]

The Pepco finalised a $602 million deal with China for raising the Guddu power plant’s capacity from 220MW to 747MW.—File photo

Pakistan Cabinet approves 14 rental power plants LAHORE: The Pakistan Electric Power Company (Pepco) on Saturday finalised a $602 million deal with the Harbin Power Engineering of China for raising the Guddu power plant’s capacity from 220MW to 747MW.

Interestingly, the deal finalised at $602 million for 747MW would cost around $800,000 per megawatt, which is almost 33 per cent less than what the independent power producers have been charging — $1.2 million to a megawatt. Electricity from rental power plants will be even costlier.

Due to the lower rate, the power price from renovated Guddu plant, at current price factor, would only be Rs4.29 per unit.

The average per unit price, which all IPPs coming on line over the next one year are charging, is a staggering Rs10.38.

‘The deal with the Chinese company only exposes the weaknesses, or corruption, of the arrangements with the IPPs or rental power plants,’ a former Wapda official said.

Had the same quantity of power been arranged through the independent power producers, it would have cost the nation around $896 million — at average rate of $1.2 million to a megawatt, he said.

The deal includes financial arrangements, with the Exim Bank (China and USA branches) providing 85 per cent of finances. Pakistan will arrange the remaining 15 per cent.

Spread over three years, the contractor would replace all four generators of Guddu power plant. Working under one of three generation companies (Genco-II) of Pepco, the Guddu plant is one of the oldest and has outlived its utility and stipulated life years ago.

Built in the early sixties, the plant had been producing only 220MW against an installed capacity of 450MW and had been a drain on financial resources of the company.

Under the deal, the contractor would bring 75 per cent open cycle generation (gas turbines) online within two years and the rest (combined cycle, or steam turbine) within one year — completing the entire project in three years.

The Economic Coordination Committee (ECC) had approved the project during the last financial year, allocating 15 per cent of the Public Sector Development Programme for such projects, which would go into financing the Pakistani part of the investment.

Speaking at the signing ceremony of the deal, the managing director of the Pepco termed it a part of the ‘exit strategy form expensive rental power’. The company is committed to retiring rental power within three years.

The company has finalised the deal at competitive market prices with highest efficiency of all installed and under construction projects in Pakistan with net efficiency of 54.5 per cent.

The Harbin Power Engineering (HPE) has also been involved in projects at Guddu, Kotri, Faisalabad, Jamshoro, Muzafargarh and Malakand. They will use gas turbines from General Electric (USA).

The project was signed by Mr GUO-YU, President of Harbin Power Engineering, and Mr Tahir Basharat Cheema of Pepco.

http://www.dawn.com/wps/wcm/connect/dawn...pps--bi-09
Find all posts by this user
Quote this message in a reply
Post Reply 


Possibly Related Threads...
Thread: Author Replies: Views: Last Post
  Chinese Group Interested in Building an Industrial Plant in Punjab LRE-Azan 0 901 03-01-2023 08:09 PM
Last Post: LRE-Azan
  Pakistan’s first waste-to-energy plant with 40-megawatt Production Capacity LRE-Azan 0 4,463 07-18-2018 04:26 PM
Last Post: LRE-Azan
  300MW Plant In Gwadar will supply Free Electricity To Aarea issued LRE-Azan 0 5,226 01-17-2018 05:05 PM
Last Post: LRE-Azan
  Chinese company to set up 300MW solar power plant in Cholistan Salman 0 9,850 08-03-2013 12:55 PM
Last Post: Salman
  Fast work on sewage treatment plant decided Salman 0 4,910 05-01-2012 01:49 PM
Last Post: Salman
  Turkish plant to start generating 56MW in Dec’ Salman 0 4,730 03-09-2012 12:18 PM
Last Post: Salman
  Defence power plant likely to fall under new management Salman 0 6,266 02-01-2012 01:15 PM
Last Post: Salman
  CDA raises housing societies fee Salman 0 3,815 01-19-2012 12:27 PM
Last Post: Salman
  CDA fails to run sewerage treatment plant Lahore_Real_Estate 0 4,101 01-03-2012 11:53 AM
Last Post: Lahore_Real_Estate
  DHA to take back Cogen power plant from Ashmore Lahore_Real_Estate 0 4,230 08-18-2011 03:25 PM
Last Post: Lahore_Real_Estate
  17% GST likely on agri plant machinery Lahore_Real_Estate 0 4,139 06-01-2011 12:22 PM
Last Post: Lahore_Real_Estate
  Govt to sanction only 700MW RPPs, says Pervez Ashraf Lahore_Real_Estate 0 3,287 01-25-2011 12:19 PM
Last Post: Lahore_Real_Estate
  Govt asks China to establish car plant in EPZs Lahore_Real_Estate 0 4,211 12-18-2010 03:52 PM
Last Post: Lahore_Real_Estate
  SC acts against shady rental plant deal Lahore_Real_Estate 0 4,178 12-08-2010 01:18 PM
Last Post: Lahore_Real_Estate
  UK-based company plans to set up 21 megawatts power plant in Karachi Lahore_Real_Estate 0 4,532 10-13-2010 12:51 PM
Last Post: Lahore_Real_Estate
  PM rules out deal with SC Lahore_Real_Estate 0 4,109 09-29-2010 01:35 PM
Last Post: Lahore_Real_Estate
  China to build 1GW nuclear power plant in Pakistan Lahore_Real_Estate 0 5,171 09-21-2010 11:49 AM
Last Post: Lahore_Real_Estate
  China in talks to export Pakistan bigger nuke plant Lahore_Real_Estate 0 4,085 09-20-2010 02:07 PM
Last Post: Lahore_Real_Estate
  UAE gifts power plant to Pakistan Lahore_Real_Estate 0 3,794 09-16-2010 12:02 PM
Last Post: Lahore_Real_Estate
  Indus Motor raises car rates by Rs 25,000-35,000 Lahore_Real_Estate 0 3,836 09-16-2010 12:01 PM
Last Post: Lahore_Real_Estate

Forum Jump:


User(s) browsing this thread: 1 Guest(s)