Post Reply 
 
Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Ad hocism defines RWP-ISB Metro bus project
06-14-2014, 02:53 PM
Post: #1
Ad hocism defines RWP-ISB Metro bus project
Ad hocism defines RWP-ISB Metro bus project

Lahores Metro Bus System (MBS) may be seen as a decent project by some metrics. However, that doesn mean that the model should be copy-pasted everywhere in the country. Following Lahores Metro bus, the Rawalpindi-Islamabad transit systems construction activities are in full swing under the supervision of go-getter Chief Minister Punjab (or is it mayor of Lahore), apparently without any adequate economic appraisal or feasibility report and other necessary certifications.

But, before we discuss the twin-city MBS project, the fact remains that even the economic feasibility of Lahore Metro bus could not be justified given that roads, bridges and related infrastructure (costing Rs27bn) for providing dedicated line to the bus was included in the total project of 64 buses running back and forth on the 27-kilometer route.

The buses with their operating system at stations were brought in by Turkish investors on easy installments. The financing was of Rs2 billion, which would be paid back on a return-guaranteed formula whether the buses are operational or not. Then the ticketing system and installation of systems at stations cost around Rs3 billion.

The response by the consumers is great, as on average 150,000 passengers travel in a day on 60 operational buses from Shahdara to Gajju Matta. Thats a good number and is probably attributed to the fact that stations at both ends are two of the busiest and the one-way travel ticket is dirt cheap at Rs20 per passenger. The amount of subsidy Punjab government is incurring to run this operation is Rs45 per passenger trip--or Rs2.5 billion per year (0.3% of Federal transfer to Punjab) burden on exchequer.

These numbers are not alarming as not much is being spent on the subsidy. However, one needs to assess the opportunity cost of this project. The overall cost of this project, including infrastructure, came at Rs32 billion. Lets see it in the perspective of the population of Lahore, where the project is catering to just one route and a fraction of citys population of 9-10 million.

A better alternative could have been to have a spatial coverage of Lahore through an integrated bus system. There was a case of running 1,000 Chinese buses (at a price of Rs10 million per bus) at the existing infrastructure with an outreach to cater to a few millions of Lahoris to save time and cost to travel all around the city.

Infrastructural financing experts say that Rs10 billion would have been enough to run a system operating on a card payment system catering all the lower-middle and low-income classes of the provincial capital. The additional infrastructure required for running this system is a large number of bus stations, which can be financed by national and multinational FMCG companies by means of advertisement.

But, prior to the 2013 general elections, CM Lahore was faced with the political compulsion to select an expensive project for the simple reason that its visibility was higher while the impact was low and the alternate solution could have reverse results. Sadly, economic rationale was superseded by the need to gain vote bank; hence, the suboptimal option was executed.

Still, be that as it may, there is no rationale whatsoever to replicate Lahores system in Rawalpindi-Islamabad without conducting requisite feasibility studies and planning. According to an industry expert, the major chunk of load would come from the 8-km stretch of Rawalpindi (costing Rs20 billion) connecting at Zero Point interchange from which its a 15-kilometer route to the Pakistan Secretariat in Islamabad. The latter stretch might not have the number of passengers to justify Rs24 billion that it will cost.

The project was approved at the whims of Shahbaz Sharif, based on the assumption that this projects load will be the same as that of Lahore, i.e. 150,000 passengers a day. However, experts are of the view that it will have half the load of what is in Lahore at best and that makes this Rs44 billion project unfeasible.

A better option could have been to have the dedicated bus lines only in Rawalpindi with a few additional buses travelling with existing traffic in Islamabad. Traffic volumes in the capital city are rather thin and roads have space enough to cater to a few busses, if and when need be.

But, despite all logic to the contrary, Sharif is more interested in executing this project in the blink of his eye. And in the process, he is successfully ignoring the projects cost to Islamabads serenity, the opportunity cost to spend these funds on other economically-viable projects, and, of course, the will of the people of Islamabad. Thats democracy, Shahbaz style.
Visit this user's website Find all posts by this user
Quote this message in a reply
Post Reply 


Possibly Related Threads...
Thread: Author Replies: Views: Last Post
  Orange Line Metro Train Project Lahore Latest Development images LRE-Azan 0 5,573 05-12-2018 01:16 PM
Last Post: LRE-Azan
  SECP yet to finalise answers to objections on Multan Metro project Salman 0 2,387 11-09-2017 01:38 PM
Last Post: Salman
  Project plan for Peshawar Metro Bus finalised Salman 0 2,756 02-07-2017 12:06 PM
Last Post: Salman
  Project plan for Peshawar Metro Bus finalised Salman 0 2,512 02-07-2017 11:56 AM
Last Post: Salman
  Underground Tunnel Progress (Metro Train Project) Salman 0 3,242 09-08-2016 12:01 PM
Last Post: Salman
  Orange Line Metro Project (Arch Bridge) Salman 0 3,149 09-06-2016 04:05 PM
Last Post: Salman
  Metro train project: LDA to deposit Rs13.17bn after property assessment Salman 0 3,048 10-21-2015 06:22 PM
Last Post: Salman
  Metro train project will be ‘speedily completed’, says CM Salman 0 3,510 08-13-2015 12:56 PM
Last Post: Salman
  Environment Department approves orange line metro project on certain conditions Salman 0 3,348 08-03-2015 01:41 PM
Last Post: Salman
  Shahbaz Sharif Seeks Reports on Metro Bus Project Salman 0 3,259 05-29-2015 06:13 PM
Last Post: Salman
  Rs165.2 bn Lahore Orange Line Metro Train project cleared Salman 0 3,762 05-07-2015 05:59 PM
Last Post: Salman
  CM orders early completion of work on Metro Bus Project Salman 0 3,291 05-05-2015 07:21 PM
Last Post: Salman
  CM Punjab visits under-construction Metro bus project in Rawalpindi Salman 0 3,059 05-05-2015 07:16 PM
Last Post: Salman
  CDA to repair roads affected by Metro Bus Project Salman 0 2,932 03-16-2015 02:40 PM
Last Post: Salman
  Contractors Delaying Metro Bus Project Islamabad Salman 0 2,900 03-14-2015 02:54 PM
Last Post: Salman
  TI moves against Rs1.2 bn funding to Nespak for Metro Bus Project Salman 0 2,893 03-10-2015 05:16 PM
Last Post: Salman
  Metro bus project in last phase of completion Salman 0 2,832 02-27-2015 05:21 PM
Last Post: Salman
  NAB seeks halt to Karachi Metro Bus project Salman 0 3,002 02-16-2015 05:49 PM
Last Post: Salman
  City govt receives 61 buses of Metro Bus Service Project Salman 0 2,851 02-14-2015 04:46 PM
Last Post: Salman
  The Delay Continues as Metro Bus Project is still not completed Salman 0 2,770 01-27-2015 05:01 PM
Last Post: Salman

Forum Jump:


User(s) browsing this thread: 2 Guest(s)