Post Reply 
 
Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Delay in Leh Expressway project worsens sewerage problem
08-18-2015, 06:39 PM
Post: #1
Delay in Leh Expressway project worsens sewerage problem
RAWALPINDI: It seems the residents of the garrison city will continue to face severe sewerage issues as well as deadly floods in the monsoon season as city planners continue to sit on the much-trumpeted Leh Expressway project.

Speaking to The Express Tribune about the much delayed project, Rawalpindi Commissioner Capt (retd) Zahid Saeed said the Leh Expressway has become a misnomer.

“I will not be able to comment on the future of the project as it is not reflected in the Annual Development Program of 2015-16,” said the chief commissioner.

Under the project two signal-free roads were to be constructed on both sides of Nullah Leh to provide hassle-free vehicular movement from Rawalpindi to Islamabad. It also includes building a pavement of the Leh drain, and reworking sewerage lines from New Katarian to Jhanda Chichi bridge.

“There are three components of the project in total; the expressway is just one component,” he said, adding that “in order to build the expressway, we would need to finish the first two components; the construction of a waste water disposal pipeline through the river bed, and cementing the river from both sides.”

Both the commissioner and Rawalpindi Development Authority’s traffic planning director Jamshed Aftab say the project has been handed over to the Punjab Highway Department. However, officials at the department dispute the claim, saying no such project has been assigned to them thus far.

An official at the Water and Sanitation Agency (Wasa) who requested not to be named said the Leh Expressway was a real solution to the flooding faced by the city every year.

“It has become a typical scenario where a development project is constantly put on the back-burner as it fails to attract the agenda of subsequent governments,” the Wasa official said.

The Rs16 billion Leh Expressway project was inaugurated by former president General (retd) Pervez Musharraf in March 2007 to tackle the issues of sewerage and recurrent monsoon flooding in the city.

The project’s original title was later renamed the ‘Sheikh Rashid Expressway’, and involved the construction of an expressway linking Ammar Chowk near Chaklala Scheme-III to the IJ Principal Road. The project was also expected to relieve the Murree Road from traffic congestion.

According to the Wasa official, an ‘elevated expressway’ project for the city was also inaugurated in 2007 to solve traffic problems, but was later cancelled by engineers after a feasibility study.
Visit this user's website Find all posts by this user
Quote this message in a reply
Post Reply 


Possibly Related Threads...
Thread: Author Replies: Views: Last Post
  MB-4 The Expressway Bahauddin Zakariya Gate on MPS Road: A Turning Point for DHA Mult LRE-Azan 0 421 11-02-2023 06:25 PM
Last Post: LRE-Azan
  Urgent Important Market Alert For Lahore Real Estate Plz Don't Delay Buying DHA Gujra LRE-Azan 0 503 10-28-2023 05:14 PM
Last Post: LRE-Azan
  32 Billion Contract Approved For Karachi Malir Expressway by Sindh Government LRE-Azan 0 2,332 01-23-2020 01:04 PM
Last Post: LRE-Azan
  PM Abbasi performed the ground breaking of the Rs17 billion East Bay Expressway LRE-Azan 0 3,137 11-22-2017 06:46 PM
Last Post: LRE-Azan
  Punjab Property News : PKR 15 billion reserved for sewerage schemes in rural areas Salman 0 2,328 10-31-2017 01:38 PM
Last Post: Salman
  CPEC railway line economic zone projects face delay Salman 0 2,482 09-22-2017 06:21 PM
Last Post: Salman
  AIIB to finance four projects including Malir Expressway S-III Salman 0 2,312 09-14-2017 05:10 PM
Last Post: Salman
  Islamabad Expressway to have segregated lane Salman 0 2,923 11-17-2015 12:30 PM
Last Post: Salman
  Work on Expressway Signal-free Corridor in full swing Salman 0 3,481 10-05-2015 06:55 PM
Last Post: Salman
  Court seeks reasons for delay in inquiry of DHA Valley’s construction on dam site Salman 0 3,482 08-03-2015 01:36 PM
Last Post: Salman
  Leh Expressway Project to be Resumed Salman 0 2,940 06-19-2015 05:29 PM
Last Post: Salman
  Gwadar Expressway, Karachi-Lahore Motorway: Chinese Ambassador for early construction Salman 0 4,100 06-10-2015 04:45 PM
Last Post: Salman
  LDA to construct 5.8km expressway from Ravi River Toll Plaza to Rachna Town Salman 0 5,459 03-16-2015 02:39 PM
Last Post: Salman
  CDA to bear cost of Islamabad Expressway extension Salman 0 3,048 02-27-2015 05:08 PM
Last Post: Salman
  The Delay Continues as Metro Bus Project is still not completed Salman 0 2,766 01-27-2015 05:01 PM
Last Post: Salman
  Work on Sialkot-Lahore Expressway, Ring Road soon Salman 0 4,006 01-26-2015 03:47 PM
Last Post: Salman
  CDA plans to run mini-train service on Islamabad Expressway Salman 0 3,189 12-13-2014 07:22 PM
Last Post: Salman
  Metro bus completion: Delay to cost Punjab, centre Rs2.6 million per day Salman 0 2,775 11-17-2014 12:23 PM
Last Post: Salman
  FIA Probes Delay In Airport Construction Salman 0 2,665 10-31-2014 01:31 PM
Last Post: Salman
  Punjab Government Approves Sewerage Project Salman 0 2,863 10-24-2014 01:36 PM
Last Post: Salman

Forum Jump:


User(s) browsing this thread: 1 Guest(s)