The following warnings occurred:
Warning [2] count(): Parameter must be an array or an object that implements Countable - Line: 802 - File: showthread.php PHP 7.4.29 (Linux)
File Line Function
/showthread.php 802 errorHandler->error





Post Reply 
 
Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
WASA to submit itself to new Walled City authority
11-08-2010, 02:54 PM
Post: #1
WASA to submit itself to new Walled City authority
Lahore: The Water and Sanitation Agency (WASA) shall soon be onboard the “Sustainable Development of the Walled City of Lahore” (SDWCL) project funded by the World Bank, Pakistan Today has learnt.
WASA is likely to sign a Memorandum of Partnership (MOP) with SDWC on November 15 with all WASA assets being transferred to the new municipal authority.
The SDWCL project was initiated in 2006 in partnership with Agha Khan Cultural Services with Rs 1.5 billion made available to restore and preserve the cultural heritage of the Walled City.
The projects’ aims include improve the urban infrastructure of the Walled City. The scope of the project includes roads, streets, parks, the power supply, water supply, and sewerage.
The project also aims to revamp tourist-related facilities (entertainment, cultural activities, parking spaces, security, residential facilities and eating places).
A temporary move: SDWCL Project Director Oriya Maqbool told Pakistan Today that the transfer of the Walled City’s sewerage and drainage system from WASA to SDWC was meant to temporary change the command infrastructure of utility services to bring them on modern lines.
Maqbool informed that all other utility services including PTCL, Sui Gas, LESCO, CDGL, LDA, PHA, TMA RAVI TOWN and TEPA are to enter into similar agreements with SDWC.
“We took possession of PTCL assets last month and shall do the same with WASA and the rest of the utilities,” he added.
‘Utilities transfer necessary’: SDWCL Infrastructure Specialist Khalid Javed said that the World Bank had approved the total layout of the project and a summary had been submitted to Punjab Planning and Development Department to get a go-ahead signal.
He said that sustainable development could never be achieved unless the infrastructure of civil utilities; especially WASA’s sewerage, drainage and storm waste lines were rehabilitated and overhauled on the demands of the digital age.
The MOP details: He informed that the WASA MD Javed Iqbal had sent a summary to LDA DG Umer Rasool to ink the MOP with the SDWCL Project Management Unit in couple of days.
Sections in the MOP state that all WASA lines shall be shifted underground. The MOP promises the improvement of the water supply system, replacement of above ground services lines (outlived and undersized), the rationalization and rearrangement of consumer connections and metering arrangements. It features rehabilitation of sewage disposal system and network of storm water drains.
The Standard Operating Instructions of MOP are that SDWCL PMU-is to finance and implement the project’s infrastructure components. It shall be their responsibility to prepare detailed and realistic estimates of cost of work, to engage contractors following a national competitive bidding procedure and pre-qualify and post-qualify firms for the physical execution of the project as agreed with the World Bank to execute the contract.
The MOP dictates that WASA is obligated to allow SDWCL PMU the statutory functions of constructing and developing the water supply and sewerage infrastructure in the Walled City. SDWCL PMU is scheduled to replace the existing system.
WASA is obligated to provide all technical information and to coordinate in the preparation of the design detail to ensure that all designs and specifications prepared aligned with the existing WASA system in the area. It will also provide the necessary technical support during the maintenance period of the contract for the fulfillment of contractual obligation of the PMU.
The MOP states that in the case of a technical, administrative or financial dispute in the administration or execution of the MOP between parties which was not resolved at operation level within a stipulated time period, the case will be brought to a committee comprising the PMU-SDWCL DG as chairperson, the WASA MD and AKTC-AKCSP Technical Director.
Restoring the Royal Trail: Communication Expert Taniya Qureshi said SDWCL’s pilot project to restore the Royal Trail (Shahi Guzar Gah) from Delhi Gate to Akbari Gate to the Lahore Fort shall continue.
The Royal Trail is the 1.6 km long street which was used by Mughal Emperors on arrival from Delhi, to reach the Badshahi Mosque, crossing the Walled City.
The Royal Trail, now a densely populated area, has housed historical monuments include the Shahi Hamam, Masjid Wazir Khan, Sonehri Mosque, Baoli Bagh, Maryam Zamani Mosque and many other buildings.
The WCL includes many outstanding landmark buildings, mosques, Sufi shrines, urban spaces and sites including the old city gates. Nearly 2000 buildings cut across the trail which are deemed to hold artistic and historical merit.
Visit this user's website Find all posts by this user
Quote this message in a reply
Post Reply 


Messages In This Thread
WASA to submit itself to new Walled City authority - Lahore_Real_Estate - 11-08-2010 02:54 PM

Possibly Related Threads...
Thread: Author Replies: Views: Last Post
  Streamlined Building Plan Approval Process by Lahore Development Authority (LDA) LRE-Azan 0 683 10-04-2023 07:09 PM
Last Post: LRE-Azan
  Ravi Urban Development Authority (RUDA) - Cash & Installment Files | Best Opportunity LRE-Azan 0 901 05-20-2023 04:23 PM
Last Post: LRE-Azan
  Capital Development Authority (CDA) urged to develop G-9 Markaz on priority LRE-Azan 0 1,018 01-21-2023 12:50 PM
Last Post: LRE-Azan
  Capital Development Authority (CDA) conducts ballot of Sector C 411 Plots LRE-Azan 0 1,056 01-21-2023 12:07 PM
Last Post: LRE-Azan
  Lahore Development Authority (LDA) Launches Major Crackdown on Illegal Commercial Act LRE-Azan 0 1,208 01-20-2023 06:15 PM
Last Post: LRE-Azan
  Lahore: Ring Road Authority Increased Toll Tax from Rs. 5 to 50 LRE-Azan 0 1,434 12-23-2021 07:34 PM
Last Post: LRE-Azan
  Capital Development Authority Update LRE-Azan 0 1,572 12-18-2021 02:21 PM
Last Post: LRE-Azan
  Capital Development Authority Update LRE-Azan 0 1,562 12-11-2021 07:52 PM
Last Post: LRE-Azan
  Ravi Development Authority Update LRE-Azan 0 1,579 11-20-2021 03:16 PM
Last Post: LRE-Azan
  Capital Development authority A Public Notice LRE-Azan 0 1,504 11-18-2021 08:29 PM
Last Post: LRE-Azan
  Illegal Constructions On The Go In Walled City Of Lahore Salman 0 6,155 03-24-2014 02:14 PM
Last Post: Salman
  Sindh Building Control Authority Cautions People About Ocean Tower Salman 0 5,074 02-28-2014 01:40 PM
Last Post: Salman
Smile Gawadar Industrial Estate Development Authority Newspaper Ad Salman 0 5,417 02-26-2014 10:16 PM
Last Post: Salman
  Administrators Appointed In Sindh Housing Authority Salman 0 4,590 02-20-2014 01:44 PM
Last Post: Salman
  National Accountability Bureau (NAB) reference against Pakistan Housing Authority CMY 0 5,011 01-25-2014 06:05 AM
Last Post: CMY
  Rawalpindi Development Authority to build 31-storey tower CMY 0 5,740 12-28-2013 08:53 AM
Last Post: CMY
  Federal Govt Decided to Establish Real Estate Regulatory Authority Salman 0 6,814 12-17-2013 01:43 PM
Last Post: Salman
  CDA asked to submit reply in I-15 petition Salman 0 6,907 11-28-2013 12:59 PM
Last Post: Salman
  Sewerage Systems Of Four Cooperative Housing Societies To Be Connected To WASA Salman 0 10,285 09-19-2013 05:44 PM
Last Post: Salman
  Preparation Of Building By-Laws, P & D To Uphold Walled City Salman 0 7,701 09-18-2013 06:28 PM
Last Post: Salman

Forum Jump:


User(s) browsing this thread: 1 Guest(s)