The following warnings occurred:
Warning [2] count(): Parameter must be an array or an object that implements Countable - Line: 802 - File: showthread.php PHP 7.4.29 (Linux)
File Line Function
/showthread.php 802 errorHandler->error





Post Reply 
 
Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Karachi: Nazim reviews work on Banaras Chowk flyover
11-24-2009, 09:23 AM
Post: #1
Karachi: Nazim reviews work on Banaras Chowk flyover
City Nazim, Syed Mustafa Kamal, paid a surprise visit to the under-construction Banaras flyover on Monday and had an appraisal from the city government officials, contractor and representative of the consultant firm present on the occasion.

On the occasion, he directed that there is a need to further speedup the work in view of the project importance and its utility for the citizens.

He pointed out that the city government has completed over 60 per cent of development work on the flyover and hoped that it would soon be opened for traffic.

On the special directive of the city Nazim, the work on 1.5 km long flyover was started at a cost of Rs1.15 billion to facilitate the people of Orangi and Baldia.

The 24 feet wide flyover having 8.2 meter wide space for bus rapid system stretches from Metro Cinema to Pirabad police station.The plan also incorporates the construction of a road under the flyover the design of which was improved on the desire of the local people.Kamal directed Executive District Officer (EDO) Works and Services, Rasheed Mughal, to expedite the construction of flyover to ensure its timely completion.

He pointed out that Banaras Chowk was a busy thoroughfare and the flyover was being constructed to overcome problems of traffic jam. He added that the project would have been completed much earlier, but it was delayed as its design had to be changed in public interest.

http://www.thenews.com.pk/daily_detail.asp?id=210156
Quote this message in a reply
Post Reply 


Messages In This Thread
Karachi: Nazim reviews work on Banaras Chowk flyover - Naveed Yaseen - 11-24-2009 09:23 AM

Possibly Related Threads...
Thread: Author Replies: Views: Last Post
  Latest Updates on Cheel Chowk Flyover and Walton Road ADA Nala Project in Lahore LRE-Azan 0 64 11-12-2024 11:11 AM
Last Post: LRE-Azan
  Chief Minister Naqvi Reviews Advancements in LRR SL-3, Gujranwala Expressway, and Dad LRE-Azan 0 638 01-23-2024 03:34 PM
Last Post: LRE-Azan
  Deadline Set for the Opening of Shahdara Chowk and Ravi Bridge LRE-Azan 0 651 01-04-2024 01:58 PM
Last Post: LRE-Azan
  CM Mohsin Naqvi Reviews Impressive 60% Completion of Lahore Ring Road Southern Loop-3 LRE-Azan 0 673 12-28-2023 12:49 PM
Last Post: LRE-Azan
  CBD Punjab CEO Imran Amin Leads Final Inspection of Renamed Ghora Chowk Flyover Honor LRE-Azan 0 502 12-22-2023 06:18 PM
Last Post: LRE-Azan
  Deadline Set for Completion of Ghora Chowk and Cavalry Ground Projects in Lahore LRE-Azan 0 634 11-18-2023 04:09 PM
Last Post: LRE-Azan
  NHA and CDA Resolve T-Chowk Design Dispute Amicably LRE-Azan 0 566 11-14-2023 02:56 PM
Last Post: LRE-Azan
  Traffic Plan Amid Cavalry Chowk Underpass Construction Issued LRE-Azan 0 643 09-12-2023 05:47 PM
Last Post: LRE-Azan
  PCBDDA Plans to Open Kalma Chowk Underpass by February 2023 LRE-Azan 0 1,050 01-25-2023 02:06 PM
Last Post: LRE-Azan
  Lahore Gulberg to Defence Chowk to be Made 5km Signal Free Corridor LRE-Azan 0 1,498 01-01-2022 06:51 PM
Last Post: LRE-Azan
  Rawal Dam Chowk Interchange likely to be completed by June 2022 LRE-Azan 0 1,768 12-15-2021 05:48 PM
Last Post: LRE-Azan
  Shahbaz Sharif reviews Ring Road project Salman 0 6,514 03-13-2014 05:18 PM
Last Post: Salman
  Flyover on Azadi Chowk : LHC extends stay against demolition Salman 0 4,965 02-26-2014 10:23 PM
Last Post: Salman
  Rs. 1.5 billion Allotted For Azadi Chowk Flyover Salman 0 5,981 02-07-2014 07:34 PM
Last Post: Salman
  Work on Azadi Chowk Interchange, New Circular Road Project starts Salman 0 8,678 01-16-2014 01:55 PM
Last Post: Salman
  Mareer Chowk Railway Bridge finally becomes operational Salman 0 5,285 01-08-2014 02:43 PM
Last Post: Salman
  Rs 1,600m approved for Azadi Chowk shifting Salman 0 9,598 11-18-2013 12:16 PM
Last Post: Salman
  DHA CITY Karachi Deveopment Work Assessed By City Manangement Salman 0 12,871 11-08-2013 02:09 PM
Last Post: Salman
  DHA City Karachi Issues Tender Notice For Development Work Salman 0 12,690 10-31-2013 02:30 PM
Last Post: Salman
  Mareer Chowk Bridge launching delayed again Salman 0 10,869 08-06-2013 11:08 AM
Last Post: Salman

Forum Jump:


User(s) browsing this thread: 1 Guest(s)