Post Reply 
 
Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Rawalpindi: Widening of Airport Road: FWO directed to complete project by Sep 21
07-25-2008, 06:47 AM
Post: #1
Rawalpindi: Widening of Airport Road: FWO directed to complete project by Sep 21
By Aamir Yasin
RAWALPINDI: Rawalpindi Development Authority (RDA) Director General Makeen Shahbaz on Thursday expressed concern over slow pace of work on Rs 1396 million Airport Road widening and remodelling project and asked the Frontier Works Organisation (FWO) to complete the project by September 21.

The RDA DG visited the project site along with officials of RDA and FWO, where he was briefed by the FWO officials about the construction work of Airport Road and a flyover, which was being built on Railway Bridge at Rahimabad.

Shahbaz was informed that widening and remodelling of the road from Kutchery Chowk to Chohan Chowk would be completed by the end of this month.

The FWO officials sought more time to complete the project as the authority had fixed September 21 deadline. The RDA chief refused the request saying no further delay would be tolerated and no extension in time limit would be granted as the project had already been delayed for four months.

He said Punjab Chief Minister (CM) Shahbaz Sharif had directed to complete the project within stipulated timeframe. The CM, he added, had also directed to work in three shifts.

The RDA chief directed the FWO to install urban traffic control signals on the road. He also called for installation of security cameras on the road before its opening for the general public. He directed the FWO to ensure lane safety measures for the convenience of people.

He also called for avoiding unnecessary U-turns on the road and urged the FWO engineers to follow international standard of traffic engineering.

According to the RDA sources, the road had been completed from Jinnah Park to Ammar Chowk and construction work was underway from Ammar Chowk to Flying Club Morr besides flyover at Rahimabad Railway Bridge, which could consume three more months.

http://www.dailytimes.com.pk/default.asp...008_pg11_4
Quote this message in a reply
Post Reply 


Possibly Related Threads...
Thread: Author Replies: Views: Last Post
  Latest Updates on Cheel Chowk Flyover and Walton Road ADA Nala Project in Lahore LRE-Azan 0 64 11-12-2024 11:11 AM
Last Post: LRE-Azan
  Rawalpindi Ring Road Set for Grand Inauguration on August 14, 2024 LRE-Azan 0 1,058 01-25-2024 03:41 PM
Last Post: LRE-Azan
  CM Naqvi Drives Forward Controlled Access Corridor Band Road Project in Lahore LRE-Azan 0 1,009 01-24-2024 06:40 PM
Last Post: LRE-Azan
  Commissioner Announces Key Milestones and Schedule for Rawalpindi Ring Road Project LRE-Azan 0 1,188 01-23-2024 03:37 PM
Last Post: LRE-Azan
  Latest News Lahore-Sialkot Motorway Link Road Project Set to Open in January LRE-Azan 0 668 01-16-2024 02:26 PM
Last Post: LRE-Azan
  Lahore-Sialkot Motorway Link Road Project Set to Open in January LRE-Azan 0 906 01-16-2024 02:25 PM
Last Post: LRE-Azan
  Rawalpindi Commissioner Confirms Limited Access to Rawalpindi Ring Road for Housing S LRE-Azan 0 627 01-10-2024 06:07 PM
Last Post: LRE-Azan
  Rawalpindi Ring Road Anticipated Launch in August LRE-Azan 0 560 01-05-2024 07:12 PM
Last Post: LRE-Azan
  Rawalpindi Ring Road (RRR) Project: 12% Completion, Anticipated Opening in August LRE-Azan 0 648 01-02-2024 06:14 PM
Last Post: LRE-Azan
  Signal-Free Walton Road Project: Tackling 18-Kilometer Infrastructure and Drainage Is LRE-Azan 0 601 12-11-2023 04:06 PM
Last Post: LRE-Azan
  Rawalpindi Ring Road Project Set to Be Completed in One Year LRE-Azan 0 636 10-11-2023 07:13 PM
Last Post: LRE-Azan
  Rawalpindi Ring Road Accelerates Towards Completion in One Year LRE-Azan 0 752 10-04-2023 07:17 PM
Last Post: LRE-Azan
  Rawalpindi Ring Road Project Faces Complication of Missing Land Record LRE-Azan 0 719 09-13-2023 07:36 PM
Last Post: LRE-Azan
  Lahore New: Saggian-Sharaqpur Road Project is inaugurated by CM Parvez Elahi LRE-Azan 0 1,111 01-21-2023 01:04 PM
Last Post: LRE-Azan
  Good News: NHA to Restart Double-Road Construction Between Rawalpindi and Kahuta LRE-Azan 0 1,427 01-20-2023 06:23 PM
Last Post: LRE-Azan
  NHA ready to begin dualisation of Rawalpindi-Kahuta Road LRE-Azan 0 999 01-18-2023 03:04 PM
Last Post: LRE-Azan
  Rawalpindi: Kachehri Chowk Signal Free project, Hearing of Objections Completed LRE-Azan 0 1,520 03-02-2022 06:54 PM
Last Post: LRE-Azan
  Rawalpindi Ring Road Among Rs265.281bln Projects Approved By ECNEC LRE-Azan 0 2,060 12-23-2021 07:27 PM
Last Post: LRE-Azan
  Rawalpindi: Lai Expressway Project, Section 4 Notification Issued for Land LRE-Azan 0 1,408 12-18-2021 02:18 PM
Last Post: LRE-Azan
  Rawalpindi: Lai Expressway Project, Section 4 Notification Issued for Land Acquisitio LRE-Azan 0 1,443 12-18-2021 02:16 PM
Last Post: LRE-Azan

Forum Jump:


User(s) browsing this thread: 1 Guest(s)