Post Reply 
 
Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Poor road engineering fails ITP road safety policy
04-12-2010, 01:03 PM
Post: #1
Poor road engineering fails ITP road safety policy
By Vidya Rana

ISLAMABAD: Traffic unfriendly Islamabad roads, roundabouts and underpasses are resulting in failure of Islamabad Traffic Police’s (ITP) road safety policy, as road accidents are on the increase.

According to the reported cases, about two car accidents are occurring daily in the capital, besides those accidents, which never get reported with the police. During last week, six accidents took place that claimed one life.

Mirvais Niaz Khan, Superintendent of Police (SP), Traffic Division, said there were multiple reasons for car accidents in the capital. He said lack of patience was one of the major reasons for such mishaps. He said due to poor designs and engineering of roads, underpasses and roundabouts, it was difficult to enforce road safety measures.

While giving an example of accidents in the inner streets of different sectors, he said, “Ideally the outer wall of a house built in the corner of a street, should be angular so that one could have a fair idea what is ahead. The case is otherwise when it comes to the inner streets of a sector, he added.

He said due to VVIP movement in the capital daily it was really a cumbersome task to manage each and every vehicle with a total strength of only 580 men and women in the department. “Of total strength 80 personnel are either on deputation, training or leave,” he added. He said they functioning with the 500 personnel, 30 motorbikes and 40 cars meant for patrolling”.

Daily Times observed that most of the car accidents could be averted if parents did not allow their children under 18 years of age to drive. Many accidents happen due to underage drivers and lack of strict implementation of rules by the ITP.

The SP said ITP had recently adopted a policy to control underage driving. “We have formed two different teams to check such vehicles driven by youngsters. We call parent and sensitise them about their responsibility to protect their own children and other road users by taking small measures,” he said, adding, the policy was being followed vigorously.

Contrary to the SP claims, one can see teens in the driving seat of black Pajeros moving on roads at the speed of jet planes. Odd U-turns and traffic cuts, dangerously close to the newly built underpasses, make such driving fatal for both the impatient youth and other road users.

It has been learnt that the Capital Development Authority while planning new infrastructure of roads and parking did not consult ITP.
Visit this user's website Find all posts by this user
Quote this message in a reply
Post Reply 


Possibly Related Threads...
Thread: Author Replies: Views: Last Post
  Latest Updates on Cheel Chowk Flyover and Walton Road ADA Nala Project in Lahore LRE-Azan 0 54 11-12-2024 11:11 AM
Last Post: LRE-Azan
  Rawalpindi Ring Road Set for Grand Inauguration on August 14, 2024 LRE-Azan 0 1,056 01-25-2024 03:41 PM
Last Post: LRE-Azan
  CM Naqvi Drives Forward Controlled Access Corridor Band Road Project in Lahore LRE-Azan 0 1,005 01-24-2024 06:40 PM
Last Post: LRE-Azan
  Commissioner Announces Key Milestones and Schedule for Rawalpindi Ring Road Project LRE-Azan 0 1,179 01-23-2024 03:37 PM
Last Post: LRE-Azan
  Road Upgrade Initiatives Set in Motion in Multan Following Punjab Chief Minister Vi LRE-Azan 0 622 01-20-2024 02:12 PM
Last Post: LRE-Azan
  Latest News Lahore-Sialkot Motorway Link Road Project Set to Open in January LRE-Azan 0 665 01-16-2024 02:26 PM
Last Post: LRE-Azan
  Lahore-Sialkot Motorway Link Road Project Set to Open in January LRE-Azan 0 896 01-16-2024 02:25 PM
Last Post: LRE-Azan
  Rawalpindi Commissioner Confirms Limited Access to Rawalpindi Ring Road for Housing S LRE-Azan 0 625 01-10-2024 06:07 PM
Last Post: LRE-Azan
  Rawalpindi Ring Road Anticipated Launch in August LRE-Azan 0 559 01-05-2024 07:12 PM
Last Post: LRE-Azan
  Rawalpindi Ring Road (RRR) Project: 12% Completion, Anticipated Opening in August LRE-Azan 0 642 01-02-2024 06:14 PM
Last Post: LRE-Azan
  Funds Approved for Various Development Projects, Including Link Road Interchange in K LRE-Azan 0 650 01-01-2024 02:03 PM
Last Post: LRE-Azan
  LDA DG Takes Charge: Bund Road Projects Undergo Comprehensive Review with Emphasis on LRE-Azan 0 567 12-30-2023 04:47 PM
Last Post: LRE-Azan
  CM Mohsin Naqvi Reviews Impressive 60% Completion of Lahore Ring Road Southern Loop-3 LRE-Azan 0 671 12-28-2023 12:49 PM
Last Post: LRE-Azan
  Signal-Free Walton Road Project: Tackling 18-Kilometer Infrastructure and Drainage Is LRE-Azan 0 592 12-11-2023 04:06 PM
Last Post: LRE-Azan
  Approval Granted for Road Projects and Development Schemes in Multiple Punjab Distric LRE-Azan 0 570 11-30-2023 06:48 PM
Last Post: LRE-Azan
  Projected 7% Reduction in Policy Rate for CY24 LRE-Azan 0 472 11-27-2023 02:13 PM
Last Post: LRE-Azan
  CM Punjab Visits Ring Road Southern Loop-3 Ahead of its Opening LRE-Azan 0 623 10-14-2023 03:24 PM
Last Post: LRE-Azan
  Rawalpindi Ring Road Project Set to Be Completed in One Year LRE-Azan 0 631 10-11-2023 07:13 PM
Last Post: LRE-Azan
  Rawalpindi Ring Road Accelerates Towards Completion in One Year LRE-Azan 0 746 10-04-2023 07:17 PM
Last Post: LRE-Azan
  Rawalpindi Ring Road Project Faces Complication of Missing Land Record LRE-Azan 0 713 09-13-2023 07:36 PM
Last Post: LRE-Azan

Forum Jump:


User(s) browsing this thread: 1 Guest(s)