The following warnings occurred:
Warning [2] count(): Parameter must be an array or an object that implements Countable - Line: 802 - File: showthread.php PHP 7.4.29 (Linux)
File Line Function
/showthread.php 802 errorHandler->error





Post Reply 
 
Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Metro Bus to be plied on elevated track in Rawalpindi: Commissioner
04-10-2014, 02:57 PM
Post: #1
Metro Bus to be plied on elevated track in Rawalpindi: Commissioner
Metro Bus to be plied on elevated track in Rawalpindi: Commissioner

Rawalpindi

Alleviating the speculations that Metro Bus Service would be run on service road from Chandni Chowk to Pir Mehr Ali Shah Arid Agriculture University, the Commissioner Rawalpindi Zahid Saeed made it clear that the bus would ply on an elevated track from Saddar to Faizabad.

Zahid Saeed, who is also chairman of Coordination Committee of Metro Bus Service Project told ‘The News’ on Tuesday that there is no plan of running the bus on road in any part of Rawalpindi, whereas in Islamabad it will also ply on elevated track at some sections.

“The work on erection of pillars is moving on rapid pace and we are confident that it would be completed well in time,” he added.

Project Manager of Metro Bus Service Amir Chattha said that it would be elevated track from Saddar to Faizabad where buses would be run very soon. “Construction work regarding erection of pillars for the elevated track from Saddar to Faizabad is moving at rapid pace as the work is going on round the clock,” he claimed.

Asghar Abbasi, a contractor of the Metro Bus Service Project said that the size of pillars, which would be erected for the elevated track is 38-meter to 42-meter in height. “Pillars of different sizes would be erected for the elevated track,” he said. He also said that they are digging out road from Saddar to Faizabad.

On the other hand, Chief Traffic Officer (Rawalpindi) Shoaib Khurram said that all-out efforts are being made by the traffic police to regulate traffic in the city during the construction period of the Metro Bus Service Project. He, however, sought the cooperation of citizens and urged them to use alternate routes to avoid traffic mess. The CTO, in a statement, said besides enhanced number of traffic wardens, the officials who were performing duties in traffic headquarters, were also deployed on different routes particularly on Benazir Bhutto Road. “Four inspectors, 110 traffic wardens and 11 junior traffic wardens are in the field, who have been warned that negligence on their part would not be tolerated at any cost,” he said. He said a comprehensive traffic plan has been devised, but the cooperation of citizens is necessary to avoid a traffic mess, mainly on the Benazir Bhutto Road.

He advised the motorists to use Airport Road through Koral Chowk, and Peshawar Road through IJ Principal Road and Golra Morr, to reach Islamabad. The citizens can come to the city area through Rawal Road, Saidpur Road and IJ Principal Road, during the construction of Metro Bus project,” he added.

The route of the Metro Bus Service will start from the Flashman’s Hotel Chowk and will end at Pakistan Secretariat, covering a total distance of 23.2 km, passing through the Benazir Bhutto Road. From Faizabad in Rawalpindi, the bus will ply on the IJ Principal Road, on to the 9th Avenue and then the Jinnah Avenue and culminate near the Pakistan Secretariat. The track will also have 24 modern stations for the passengers. Of these, 10 will be on the Benazir Bhutto Road, while 14 will be in Islamabad. In Rawalpindi portion, bus will stop at Mareer Chowk, Liaquat Bagh, Committee Chowk, Benazir Bhutto Hospital, Chandni Chowk, Sixth Road, Rehmanabad, Sadiqabad, Double Road and Faizabad.
Visit this user's website Find all posts by this user
Quote this message in a reply
Post Reply 


Messages In This Thread
Metro Bus to be plied on elevated track in Rawalpindi: Commissioner - Salman - 04-10-2014 02:57 PM

Possibly Related Threads...
Thread: Author Replies: Views: Last Post
  Exiting News: Bedian Road Underpass Now Opened | A Fast-Track Development In the Hist LRE-Azan 0 521 11-15-2023 07:26 PM
Last Post: LRE-Azan
  DHA Quetta | Development Work on Fast Track | December 2021 LRE-Azan 0 1,310 12-23-2021 07:30 PM
Last Post: LRE-Azan
  Lahore Smart City | This is Called Fast Track Development LRE-Azan 0 1,194 12-23-2021 07:27 PM
Last Post: LRE-Azan
  Lahore Smart City | Development Progress on Fast Track | Update by LRE | April 2021 LRE-Azan 0 1,849 04-20-2021 05:04 PM
Last Post: LRE-Azan
  LDA City Lahore | Development Work Started in Block D on Fast Track | Drone Video | D LRE-Azan 0 1,754 12-11-2020 09:25 PM
Last Post: LRE-Azan
  LRR SL to be complete by the end of November Commissioner Lahore LRE-Azan 0 3,023 11-04-2017 05:34 PM
Last Post: LRE-Azan
  Work on Gulberg-Motorway Elevated Road To Start Soon Salman 0 3,065 02-25-2017 11:59 AM
Last Post: Salman
  Raiwind Road railway track flyover foundation stone laid Salman 0 3,323 08-23-2016 12:50 PM
Last Post: Salman
  Raiwind Road railway track flyover foundation stone laid Salman 0 3,112 08-23-2016 11:56 AM
Last Post: Salman
  Metro Train Construction Status Of Under Ground Track Salman 0 3,133 07-18-2016 12:25 PM
Last Post: Salman
  (Deputy Commissioner Rates) Salman 0 3,107 07-02-2016 12:32 PM
Last Post: Salman
  DHA Lahore Phase 9 Prism. Fast Track Development Starting Feb 8 2016 Salman 0 3,859 02-08-2016 02:34 PM
Last Post: Salman
  RDA TO COMPLETE DEVELOPMENT PROJECTS ON FAST TRACK Salman 0 2,724 01-08-2016 05:51 PM
Last Post: Salman
  Islamabad-Rawalpindi Metro set for Inauguration Salman 0 2,803 06-10-2015 04:22 PM
Last Post: Salman
  CM Punjab visits under-construction Metro bus project in Rawalpindi Salman 0 3,051 05-05-2015 07:16 PM
Last Post: Salman
  Metro will get on track by January 2015 Salman 0 2,431 11-10-2014 01:53 PM
Last Post: Salman
  NAB to probe Rawalpindi Metro Bus project Salman 0 2,575 10-25-2014 01:49 PM
Last Post: Salman
  LDA Plans To Acquire Land To Build Elevated Expressway Salman 0 3,409 09-16-2014 11:57 AM
Last Post: Salman
  Hyderabad Commissioner Gives Directions To Expedite Overpass Repair Work Salman 0 2,719 08-07-2014 04:59 PM
Last Post: Salman
  Commissioner Office Launches Anti-Encroachment Courts Salman 0 2,667 07-25-2014 12:53 PM
Last Post: Salman

Forum Jump:


User(s) browsing this thread: 1 Guest(s)