Post Reply 
 
Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Karachi: DHA reviews road reconstruction project
01-03-2009, 08:24 AM
Post: #1
Karachi: DHA reviews road reconstruction project
The progress of the project to reconstruct roads damaged during laying out the new drainage system in DHA was reviewed at the meeting of Works Committee of Cantonment Board Clifton (CBC) held at Defence Housing Authority’s (DHA) main office on Friday.

The meeting was chaired by DHA Administrator Brig Khalid, and comprised of representatives from Defence Residents’ Associations, concerned CBC and DHA officials, consultants, engineers and contractors associated with the project, CBC CEO, Zeenat Ahmed, and President Association of Defence Residents’ (ADR) Capt (retd) Kamal-Al- Karimi.

The DHA administrator asked contractors to ensure that road construction was organized and the quality of work not compromised. He also urged the timely completion of the venture in a transparent and professional manner. DHA Works and Special Projects Director, Brig (retd) Iftikhar Haider, would monitor the quality and technical efficacy of the project.

Tirmizi also directed contractors to ensure that minimum inconvenience is caused to residents during the construction of roads. He further stressed the need to improve markings and sign postings at work sites. He said that all sites should prominently indicate diversion routes in the form of guide maps, warning lights and clearly visible indicator signs. He instructed that the name of the contractors, duration of the project and other details should prominently be displayed at the site.

The administrator said that he would personally monitor and get regular feedback about the progress of the project, and urged contractors and engineers concerned to rise to the occasion.

http://www.thenews.com.pk/daily_detail.asp?id=155312
Quote this message in a reply
Post Reply 


Possibly Related Threads...
Thread: Author Replies: Views: Last Post
  Latest Updates on Cheel Chowk Flyover and Walton Road ADA Nala Project in Lahore LRE-Azan 0 65 11-12-2024 11:11 AM
Last Post: LRE-Azan
  CM Naqvi Drives Forward Controlled Access Corridor Band Road Project in Lahore LRE-Azan 0 1,009 01-24-2024 06:40 PM
Last Post: LRE-Azan
  Commissioner Announces Key Milestones and Schedule for Rawalpindi Ring Road Project LRE-Azan 0 1,190 01-23-2024 03:37 PM
Last Post: LRE-Azan
  Chief Minister Naqvi Reviews Advancements in LRR SL-3, Gujranwala Expressway, and Dad LRE-Azan 0 639 01-23-2024 03:34 PM
Last Post: LRE-Azan
  Latest News Lahore-Sialkot Motorway Link Road Project Set to Open in January LRE-Azan 0 672 01-16-2024 02:26 PM
Last Post: LRE-Azan
  Lahore-Sialkot Motorway Link Road Project Set to Open in January LRE-Azan 0 909 01-16-2024 02:25 PM
Last Post: LRE-Azan
  Rawalpindi Ring Road (RRR) Project: 12% Completion, Anticipated Opening in August LRE-Azan 0 648 01-02-2024 06:14 PM
Last Post: LRE-Azan
  CM Mohsin Naqvi Reviews Impressive 60% Completion of Lahore Ring Road Southern Loop-3 LRE-Azan 0 675 12-28-2023 12:49 PM
Last Post: LRE-Azan
  Signal-Free Walton Road Project: Tackling 18-Kilometer Infrastructure and Drainage Is LRE-Azan 0 602 12-11-2023 04:06 PM
Last Post: LRE-Azan
  Rawalpindi Ring Road Project Set to Be Completed in One Year LRE-Azan 0 636 10-11-2023 07:13 PM
Last Post: LRE-Azan
  Rawalpindi Ring Road Project Faces Complication of Missing Land Record LRE-Azan 0 719 09-13-2023 07:36 PM
Last Post: LRE-Azan
  Lahore New: Saggian-Sharaqpur Road Project is inaugurated by CM Parvez Elahi LRE-Azan 0 1,113 01-21-2023 01:04 PM
Last Post: LRE-Azan
  Rawalpindi Ring Road Project New Design is Ready LRE-Azan 0 1,675 11-20-2021 12:22 PM
Last Post: LRE-Azan
  Rawalpindi: Ring Road Project, Rs. 24 Billion Approved in PC-1 LRE-Azan 0 1,483 10-27-2021 01:04 PM
Last Post: LRE-Azan
  LWMC has Launched an Operation to make Mall Road a Model road of the City LRE-Azan 0 4,503 08-09-2018 06:35 PM
Last Post: LRE-Azan
  Bahria Town Karachi project and it’s invisible hands Salman 0 6,447 03-17-2014 01:29 PM
Last Post: Salman
  Shahbaz Sharif reviews Ring Road project Salman 0 6,517 03-13-2014 05:18 PM
Last Post: Salman
  Minister dissatisfied over delay in Kurri Road project Salman 0 5,011 02-25-2014 01:16 PM
Last Post: Salman
  Work on Azadi Chowk Interchange, New Circular Road Project starts Salman 0 8,681 01-16-2014 01:55 PM
Last Post: Salman
  Khaira Distributory Road that links Package 17 of Ring Road to Ferozepur Road Salman 0 10,608 11-30-2013 12:48 PM
Last Post: Salman

Forum Jump:


User(s) browsing this thread: 1 Guest(s)